Technology

Building Plan Approval Verification for Home Loans

|Posted by Hitul Mistry / 19 Nov 26

Last reviewed: November 2026

Building plan approval verification for home loans is the lender's check that a property's building plan was approved by the competent planning authority, that the permit is genuine and valid, and that the building on site matches it. Skip it, and an extra floor or a ground-floor shop the plan never approved can leave part of your security unauthorised, hard to sell or at risk of demolition.

This guide is for chief credit officers and heads of legal and technical verification at housing finance companies (HFCs), non-banking financial companies (NBFCs) and banks. It covers the Reserve Bank of India (RBI) rules, official portals for checking permits, the fields to read, a deviation formula and a 12-point checklist, plus where Digiqt's DocuEye removes the reading work.

Key Takeaways

  • A sanctioned plan is mandatory before an HFC sanctions a construction loan, and an architect must certify ready homes against it before disbursement.
  • Many states let you verify permits online. Use the permit number, the QR code or the authority's citizen search before trusting a paper copy.
  • Value only what was approved. Unapproved floors and extensions should carry no security value.

What Is Building Plan Approval Verification for Home Loans?

Building plan approval verification for home loans answers three questions: is the approval genuine, does it belong to this property and applicant, and was the building built as approved. It sits after title checks, covered in our guide to property document fraud in home loans, as part of legal and technical due diligence.

A sanctioned plan is the permission to build, issued before construction. A completion or occupancy certificate (OC) is issued after construction, once the authority confirms the building matches that permission.

Is a Sanctioned Plan Mandatory for a Home Loan?

Yes, a sanctioned plan is mandatory for HFC home loans. The RBI Housing Finance Companies Directions, 2025 (RBI/DoR/2025-26/365, 28 November 2025) set five plan-related conditions.

SituationWhat the HFC Directions RequirePara
Loan to build on own plotCopy of the sanctioned plan in the applicant's name before sanction; affidavit-cum-undertaking not to violate it and to get a completion certificate within 3 months of completion; architect certifies each stage179
Loan to buy a built house or flatAffidavit that it was built as per the sanctioned plan and/or bye-laws; architect appointed by the HFC certifies before disbursement that it is "strictly as per the sanctioned plan"180
Unauthorised colonyNo loan until regularised and charges paid181
Residential property for declared commercial useNo loan182
Under-construction homeDisbursal strictly linked to construction stages183

Banks follow the same conditions; paragraph 102 of the RBI's Regional Rural Banks Credit Facilities Directions, 2025 repeats them almost word for word. Separately, the Supreme Court directed in Rajendra Kumar Barjatya v. U.P. Avas Evam Vikas Parishad (18 December 2024) that banks and financial institutions sanction loans against a building only after verifying its completion or occupation certificate.

What Does Manual Plan Checking Cost a Home Loan Lender?

Manual plan checking costs about 25 analyst minutes per file, plus deviations found only after disbursement. In this illustrative scenario, a lender processes 600 home loan and loan against property (LAP) files a month.

MeasureManual ReadingDocuEye Extraction With Exception Review
Minutes per plan (read, match, look up)2510
Analyst hours a month250100
Hours released–150, about one full-time analyst
Deviations caught only after disbursement (2%)12Flagged at technical review

That is twelve monthly loans partly secured by construction the lender cannot rely on.

How Do You Verify a Building Plan Approval Online?

You verify a building plan approval online by searching the permit number on the issuing authority's portal, scanning the quick response (QR) code on newer permits, or using the authority's citizen search. We checked every portal below on 19 November 2026.

State or CityOfficial PortalWhat You Can Look Up
Bengaluru (Greater Bengaluru Authority city corporations)Building Plan Approval System (BPAS)Licences carry a QR code and tell readers to "scan the QR Code or Check Citizen Search"
TelanganaBuildNow TelanganaQuick search on the system that replaced TG-bPASS
Andhra PradeshAPDPMS portalState building permit system; match the permit file number
Tamil NaduSingle Window Portal for Planning PermissionApplication status
MumbaiMunicipal Corporation of Greater Mumbai AutoDCRBuilding proposal system for Greater Mumbai
KeralaK-SMARTLocal body services, including building permits

What If a Building Plan Approval Is Not Online?

If a building plan approval is not online, ask your panel advocate or technical vendor to confirm the permit with the authority's office, and record who confirmed it and when. Approvals issued before a portal went live often exist only on paper.

Which Fields on a Sanctioned Plan Should Lenders Check?

Lenders should check twelve fields on a sanctioned plan and match each one against another document in the file. A December 2025 Bengaluru East City Corporation building licence, for example, prints most of them, including a QR code and a five-year validity.

Plan FieldMatch Against
Permit or licence number and file numberAuthority portal or office record
Issuing authority and ward or zoneProperty location in the title deed
Applicant or owner nameSeller in the sale deed or borrower
Property ID and survey numbersProperty tax receipts and deed schedule
Sanction date and validityConstruction stage and disbursement date
Site areaDeed and survey records
Built-up area per blockMeasured area in the valuation report
Number of floors and heightSite visit photographs
Setbacks and floor space indexSite measurement and plot area
Building use (residential or commercial)Loan product and actual use
Annexed conditionsSanction conditions and undertakings
Digital signature or QR codeAuthenticity check on the portal

How Do You Calculate Deviation From a Sanctioned Building Plan?

You calculate deviation from a sanctioned building plan by comparing the measured built-up area with the sanctioned built-up area, then checking floors, use, setbacks and floor space index (FSI) separately.

Area deviation % = (measured built-up area − sanctioned built-up area) ÷ sanctioned built-up area × 100

FSI used = total built-up area ÷ plot area, which should not exceed the FSI on the sanctioned plan. FSI is also called floor area ratio (FAR), and local rules decide which areas count.

Local rules decide how much deviation can be compounded or regularised, so check them before treating a deviation as curable. An illustrative lender policy:

FindingSuggested Action
Area deviation up to 5%, same floors and useNote it; value on the measured area
Area deviation 5–15%Value on the sanctioned area; legal confirms if it can be regularised
Area deviation above 15% or extra floorValue on the sanctioned area only; credit committee decision
Change of use or unauthorised colonyDecline or hold until regularised (paras 181–182)

What Happens When a Resale House Has an Extra Floor?

When a resale house has an extra floor, the lender values only the sanctioned area, which usually shrinks the loan. In this illustrative case, the applicant wants ₹90 lakh against a house sanctioned for ground plus one floor and 2,000 sq ft, but the valuer measures ground plus two floors and 2,750 sq ft.

The area deviation is (2,750 − 2,000) ÷ 2,000 = 37.5%, with an extra floor. At ₹5,000 per sq ft, the claimed value is ₹1.375 crore but the sanctioned value is ₹1 crore, so the loan-to-value (LTV) ratio rises from 65% to 90% and the lender cuts the loan to fit its LTV policy.

Are your technical teams still reading sanctioned plans page by page?

See How DocuEye Reads Sanctioned Building Plans

See DocuEye pull permit numbers, floors, areas and validity into structured data, or talk to us about your verification workflow.

How Does DocuEye Support Building Plan Approval Verification?

DocuEye supports building plan approval verification by turning sanctioned plans, permit letters and scanned approvals into structured fields that your rules can check. DocuEye is Digiqt's artificial intelligence (AI) document intelligence product, combining optical character recognition (OCR) with a logic-based extraction engine across more than 50 document types.

StepManual TodayWith DocuEye
FormatAnalyst learns each authority's layoutCustomisable template per authority format
ExtractPermit number, floors and area retypedSmart field detection reads each field
Older plansHandwritten endorsements skippedHandwriting recognition and multi-language support
ValidateDepends on the reviewerBuilt-in rules flag floor, area, use and validity gaps
OutputNotes in the technical reportStructured data sent to your loan system

Portal lookups, site visits and the final call stay with your legal and technical teams. Deviation flags can be routed through valuation agency management and advocate panel management, with results feeding your housing finance software.

What Should a Building Plan Approval Checklist for Home Loans Include?

A building plan approval checklist for home loans should include 12 checks covering authenticity, ownership, validity and the match between plan and site. Copy this list into your technical verification template.

  1. Collect the full sanctioned plan with all sheets, the permit letter and the annexed conditions.
  2. Confirm the issuing authority has jurisdiction over the property's location.
  3. Look up the permit number on the authority's portal, or scan the QR code.
  4. Match the applicant or owner name with the sale deed or seller.
  5. Match the property ID and survey numbers with the deed and tax receipts.
  6. Check the sanction date and validity against the construction stage.
  7. Compare sanctioned floors, height and setbacks with site photographs.
  8. Calculate area deviation and FSI used from the measured built-up area.
  9. Confirm the approved use matches the loan product and actual use.
  10. Check that the colony or layout is authorised or regularised.
  11. For construction loans, collect the undertaking and schedule stage-wise architect certificates.
  12. For finished buildings, collect the completion or occupancy certificate and the architect's pre-disbursement certificate.

For builder projects, add construction finance monitoring for lenders. For LAP files, feed the sanctioned value into loan against property underwriting and track security through mortgage creation tracking.

Want floor and area deviations flagged before sanction, not after disbursement?

Book a DocuEye Demo for Plan Approval Checks

See DocuEye extract fields from your own sample plans, or visit Digiqt to request a consultation.

Sources

Read our latest blogs and research

Featured Resources

Technology

Property Document Fraud in Home Loans: Spot Forged Titles

Property document fraud in home loans: how title papers are forged, and the forensic, registry, CERSAI and legal audit checks that stop them before sanction.

Read more
Technology

Property Tax Receipt Verification for Lenders: Mortgages

Property tax receipt verification for lenders: fields to extract, how to match owner, address and area, KYC rules and how DocuEye reads the receipts.

Read more
Technology

Construction Finance Monitoring for Lenders Before Each Draw

Construction finance monitoring for lenders: what to verify before each release, RERA account checks, a 7-step workflow, 8 red flags and 5 metrics.

Read more

About Us

We are a technology services company focused on enabling businesses to scale through AI-driven transformation. At the intersection of innovation, automation, and design, we help our clients rethink how technology can create real business value.

From AI-powered product development to intelligent automation and custom GenAI solutions, we bring deep technical expertise and a problem-solving mindset to every project. Whether you're a startup or an enterprise, we act as your technology partner, building scalable, future-ready solutions tailored to your industry.

Driven by curiosity and built on trust, we believe in turning complexity into clarity and ideas into impact.

Our key clients

Companies we are associated with

Life99
Edelweiss
Aura
Kotak Securities
Coverfox
Phyllo
Quantify Capital
ArtistOnGo
Unimon Energy

Our Offices

Ahmedabad

B-714, K P Epitome, near Dav International School, Makarba, Ahmedabad, Gujarat 380051

+91 99747 29554

Mumbai

C-20, G Block, WeWork, Enam Sambhav, Bandra-Kurla Complex, Mumbai, Maharashtra 400051

+91 99747 29554

Stockholm

Bäverbäcksgränd 10 12462 Bandhagen, Stockholm, Sweden.

+46 72789 9039

Malaysia

Level 23-1, Premier Suite One Mont Kiara, No 1, Jalan Kiara, Mont Kiara, 50480 Kuala Lumpur

Lewes

16192 Coastal Highway, Lewes, Delaware 19958, USA

software developers ahmedabad
ISO 9001:2015 Certified

Call us

Career: +91 90165 81674

Sales: +91 99747 29554

Email us

Career: hr@digiqt.com

Sales: hitul@digiqt.com

© Digiqt 2026, All Rights Reserved